N.J.S.A. 58:10-23.11c

Hazardous substance discharge prohibited; exceptions

58:10-23.11c. Hazardous substance discharge prohibited; exceptions 4. The discharge of hazardous substances is prohibited. This section shall not apply to discharges of hazardous substances pursuant to and in compliance with the conditions of a Federal or State permit, or to any discharge of petroleum to the surface waters of the State that occurs as a result of the process of recovering, containing, cleaning up or removing a discharge of petroleum in the surface waters of the State and that is undertaken in compliance with the instructions of a federal on-scene coordinator or of the commissioner or the commissioner's designee . L.1976,c.141,s.4; amended 1995,c.16,s.2. 58:10-23.11d1. Definitions As used in this act: "Major facility" has the same meaning as set forth in section 3 of P.L.1976, c.141 (C.58:10-23.11b); "Transmission pipeline" means new and existing pipe and any equipment, facility, rights-of-way, or building used or intended for use in the transportation of a hazardous substance by a pipeline and having a throughput capacity as established by regulations adopted by the department. Transmission pipeline does not include the transportation of a hazardous substance through onshore production or flow lines, refining, or manufacturing facilities, or storage terminals or inplant piping systems associated with those facilities that are within the boundaries of a major facility. L.1990,c.78,s.1. 58:10-23.11d2. Submission of discharge prevention, control and countermeasure plan a. Each owner or operator of a major facility or a transmission pipeline shall submit to the Department of Environmental Protection a discharge prevention, control, and countermeasure (DPCC) plan reviewed and certified by a professional engineer licensed pursuant to P.L.1938, c.342 (C.45:8-27 et seq.) who shall attest that the plan complies with all applicable departmental requirements and has been prepared in accordance with sound engineering practices. b. The DPCC plan shall contain the following information: (1) The name of the major facility or transmission pipeline; (2) The name and address of the owner or operator of the major facility or transmission pipeline; (3) The location of the major facility or transmission pipeline; (4) A description of the major facility or transmission pipeline and a general site plan and maps showing, as applicable, the locations of all below-ground or above-ground structures in which hazardous substances are stored, handled, used, or transported, including off-site transmission pipelines from a major facility and respective pipeline terminuses in- or out-of-State, along with flow diagrams of major facility or transmission pipeline operations; (5) The number of barrels or other storage capacity of the major facility, or, in the case of transmission pipelines, the transportation capacity of these pipelines, the type and amount of hazardous substances transferred, refined, processed, or stored at the major facility or transmission pipeline, and the average daily throughput of the major facility or transmission pipeline; (6) Topographical and other maps of the major facility's or transmission pipeline's site and off-site land and water areas in proximity to the major facility or transmission pipeline that could be adversely affected by a discharge or other emergency. The maps shall identify and delineate residential and other land use areas, as well as all environmentally sensitive areas, and identify the nature of the threats from a discharge thereto; (7) Drainage and diversion plans of the major facility or transmission pipeline, including the location of all major sewers, storm sewers, catchment or containment systems or basins, diversion systems, and all watercourses into which surface water run-off from the major facility or transmission pipeline drains, which drainage and diversion plans shall be designed, where applicable, to prevent hazardous substances, including nonpoint source pollutants, from draining off-site or into ground or surface waters of the State; (8) A discharge prevention plan and policy statement that identifies (a) leak detection and discharge prevention safety systems, devices, equipment, procedures, or other measures established for the major facility or transmission pipeline to prevent an unauthorized discharge, (b) the schedules, methods, and procedures for testing, maintaining, and inspecting above-ground and below-ground storage tanks, pipelines, and other structures, and leak detection and other preventive or safety systems, devices, or equipment and (c) the qualifications of personnel specifically charged with implementing the DPCC plan and policy, and the authority delegated thereto; (9) A summary of the nature, scope, and frequency of discharge prevention and emergency response training programs and requirements for major facility or transmission pipeline personnel; (10) Any other information deemed necessary or useful by the department. The department may determine the manner and form in which the above information is to be provided, including the form and technology to be used in complying with the mapping requirements of this subsection. L.1990,c.78,s.2. 58:10-23.11d3. Submission of discharge response, cleanup and removal contingency plan a. Each owner or operator of a major facility or transmission pipeline shall submit to the Department of Environmental Protection a discharge response, cleanup, and removal contingency plan, attested to by the owner or operator, who shall certify the maximum emergency response capability at the major facility or transmission pipeline, that the trained personnel and response equipment as specified in the contingency plan are available or are at the disposal for the major facility or transmission pipeline, that the equipment is in good repair, and that the contingency plan is consistent with applicable local, regional, and State emergency response plans. b. The contingency plan shall contain the following information: (1) A summary and detailed description of the major facility's or transmission pipeline's action plan used by a major facility's or transmission pipeline's personnel and discharge cleanup contractors, as applicable, in responding to, and minimizing health and environmental dangers from, fires, explosions, or unauthorized discharges or releases of hazardous substances to the air, soil, or waters of the State, including the deployment of personnel and equipment in the event of a discharge or other emergency, and the chain of command for an emergency response action. The action plan shall provide for simulated emergency response drills, to be conducted at least once a year, to determine the currency and adequacy of, and personnel familiarity with, the emergency response action plan; (2) An identification of all personnel and equipment available for cleanup and response activities, including all equipment and personnel located off-site that are either under the direct control of the owner or operator of the major facility or transmission pipeline, or that are available, by contract, to the major facility or transmission pipeline in the event of discharge or other emergency, and the amount of time that would be required to mobilize and deploy all response personnel and equipment. A copy of all current contracts or agreements between the owner or operator of a major facility or transmission pipeline and a discharge cleanup organization for emergency response service, including containment, cleanup, removal and disposal, shall be maintained at the facility, or in the case of a transmission pipeline, with a registered agent of the owner or operator or the transmission pipeline. Upon request the contracts or agreements shall be made available to the department; (3) The names, home addresses, and qualifications of major facility or transmission pipeline emergency response coordinators, and alternates, and identification and qualifications of the other emergency response personnel trained and required to respond to a discharge or other emergency, and to operate containment, cleanup, and removal equipment. The contingency plan shall specify the authority and responsibilities of the coordinator or alternate in the event of a discharge or other emergency. A qualified coordinator or alternate shall be present at all times at a major facility; (4) A plan identifying priorities for the off-site deployment of personnel and equipment to protect residential, environmentally sensitive, or other areas against a discharge or other emergency based on use, seasonal sensitivity, or other relevant factors; (5) An environmentally sensitive areas and habitats protection plan, reviewed and certified by a marine biologist and an ornothologist, that shall (a) identify all environmentally sensitive areas and wildlife habitats that could be affected by a discharge from the major facility or transmission pipeline, (b) identify the seasonal sensitivity of the areas or habitats, (c) in the event of a discharge, provide for the protection from, and mitigation of, any potentially adverse impact of the discharge on the identified areas or habitats, and (d) provide for an environmental assessment of the impact of any discharge on the identified areas and habitats, including the effects on the habitat's flora, fauna or organisms. The environmentally sensitive areas and habitats protection plan shall, using criteria established by the department for identifying environmentally sensitive areas or habitats, identify any environmentally sensitive area or habitat that could be adversely affected by a discharge from a major facility or transmission pipeline; (6) A copy of an agreement with the local emergency planning committee or committees that coordinate the emergency responses of the parties to the agreement; (7) Any other information deemed necessary or useful by the department. c. The department shall develop base maps, including but not limited to, waterways, wetlands, coastal areas, water supply areas, shellfish growing areas, and endangered and threatened species areas, to provide comprehensive, contiguous coverage of land and water areas. L.1990,c.78,s.3. 58:10-23.11d4. Renewal of plans Each DPCC plan and contingency plan shall be renewed every five years with the department unless the department requires a more frequent submission. Applications for plan renewals shall be accompanied by a summary of all unauthorized discharges at a major facility or transmission pipeline, and any other information as may be deemed necessary or useful by the department. Plan renewals may be limited to certifying that the existing plans on file with the department are current. Filing of a revised plan may be required by the department at the time of renewal so as to incorporate into the plan all amendments adopted since the filing of the original plan or its last renewal. Amendments to a DPCC plan, a contingency plan, or any other information required to be filed with the department pursuant to this act shall be filed within 30 days of the date of any modification of a facility or transmission pipeline necessitating a change in a plan or other information filed with the department. Plan renewals or amendments shall be certified in the same manner as the original plan. L.1990,c.78,s.4. 58:10-23.11d5. Retention of evidence of financial responsibility of cleanups. The owner or operator of a major facility or transmission pipeline shall, at all times, retain on file with the department evidence of financial responsibility for cleaning up and removing a discharge or release of a hazardous substance, and for the removal of any abandoned structure owned or operated, as the case may be, by the owner or operator of a major facility or transmission pipeline. The amount, nature, terms, and conditions of the financial responsibility shall be determined by the department. The owner or operator of a major facility or transmission pipeline shall file evidence of financial responsibility with the department within 180 days of the effective date of P.L.1990, c.78 (C.58:10-23.11d1 et al.). L.1990,c.78,s.5. 58:10-23.11d6. Regulation of submitted plans, renewals, amendments The department shall prescribe, by regulation, the manner, form and contents of the plans, renewals, amendments, and other submissions required to be filed pursuant to P.L.1990, c.78 (C.58:10-23.11d1 et al.) so as to ensure the consistency of plans, specifications, maps or other submissions filed with the department pursuant to this act as to form, content, clarity, geographical reference to State plan coordinates, or any other criteria deemed necessary by the department. The department shall prescribe by regulation the amount, nature, and conditions of financial responsibility of the owner or operator of a major facility or transmission pipeline as required pursuant to section 5 of P.L.1990, c.78 (C.58:10-23.11d5). The department shall establish, as applicable, minimum performance standards or requirements for any of the DPCC or contingency plan elements. Plans, plan renewals and amendments, plan components and any other required submissions to the department shall comply with departmental regulations, and, as applicable, shall be certified by a licensed engineer or land surveyor. L.1990,c.78,s.6. 58:10-23.11d7. Filing of plans with local emergency prevention or planning committees A copy of a DPCC plan and contingency plan, or plan renewal, and all plan amendments shall be filed by the owner or operator of a major facility or transmission pipeline with the local emergency prevention or local emergency planning committee or committees. L.1990,c.78,s.7. 58:10-23.11d8. Distribution of submission, filing of plans The owner or operator of a major facility or transmission pipeline who has on file with the department as of the date of adoption of rules or regulations pursuant to section 14 of P.L.1990, c.78 (C.58:10-23.11d14) a DPCC plan and a contingency plan reviewed and approved pursuant to section 5 of P.L.1976, c.141 (C.58:10-23.11d), or the owner or operator of a major facility or transmission pipeline who does not have on file with the department a DPCC plan and a contingency plan reviewed and approved by the department, shall file a new DPCC plan and a contingency plan in accordance with a schedule provided by the department and promulgated pursuant to the "Administrative Procedure Act," P.L.1968, c.410 (C.52:14B-1 et seq.) so as to evenly distribute the submittal and filing of DPCC plans and contingency plans. The department shall use the following criteria to evenly distribute the submittal and filing of DPCC plans and contingency plans: size of the facility, material being stored, and proximity to environmentally sensitive areas or habitats. The schedule adopted by the department for submitting a DPCC plan or a contingency plan shall not extend beyond three years after the adoption of the rules or regulations pursuant to section 14 of P.L.1990, c.78 (C.58:10-23.11d14). L.1990,c.78,s.8. 58:10-23.11d9. Review of plans filed a. Except as otherwise provided in subsection b. of this section, the department shall, as soon as practicable, but not later than six months following a filing of a DPCC plan, contingency plan, or a renewal thereof, or, in the case of plan amendments, within 60 days of the filing of the amendments, review the filing to determine compliance with all statutory requirements, including rules and regulations adopted thereunder. b. The department may, at any time during the plan, plan renewal or plan amendment review period approve, conditionally approve, or disapprove a plan, plan renewal, or plan amendments. If a plan, plan renewal or plan amendments are disapproved, the owner or operator of the major facility or transmission pipeline shall have 30 days from receipt of written notice of the disapproval, and the reasons therefor, within which to submit a revised plan or plan amendments. The department may, at any time after an on-site inspection of a facility or pipeline, or a discharge or other emergency at a facility or pipeline, direct the owner or operator of the major facility or transmission pipeline to submit amendments to a DPCC plan or contingency plan on file with the department, or to submit additional documentation or information in conjunction with a filed plan or amendments. If within 30 days of receipt of a written request therefor, the owner or operator of the major facility or transmission pipeline fails to file a revised plan, amendments, or requested information satisfactory to the department, or fails to contest the department's request in accordance with the "Administrative Procedure Act," P.L.1968, c.410 (C.52:14B-1 et seq.), the DPCC plan, contingency plan, renewal plan, or plan amendments shall be deemed to have been disapproved by the department and the owner or operator of the facility or pipeline shall be in violation of section 2 or section 3, as appropriate, of P.L.1990, c.78 (C.58:10-23.11d2 or 58:10-23.11d3). The department may, for good cause, extend by up to an additional 30 days the time period for filing a revised plan or plan amendments, or for responding to a request for information. L.1990,c.78,s.9. 58:10-23.11d10. Report of unauthorized discharge, system malfunction a. The owner or operator of a major facility or transmission pipeline shall immediately report any unauthorized discharge occurring at the major facility or transmission pipeline. Within 30 days of the reporting of a discharge, the owner or operator of a major facility or transmission pipeline shall provide the department with a full report on the nature and causes of the discharge, the nature and chronology of the actions taken by the owner or operator and other parties to clean up and remove the discharged hazardous substance, an evaluation of all pertinent prevention and response plans and policies in light of the discharge, and the owner's or operator's response thereto, and the measures taken to avoid a recurrence of similar discharges and to remedy shortcomings in the prevention, detection, response, containment, cleanup, or removal plan components. The report shall be accompanied by any amendments that may be required to the DPCC and contingency plans. Upon evaluation of the report, the department may direct the owner or operator of the major facility or transmission pipeline to make appropriate amendments to its DPCC or contingency plan in order to prevent a recurrence of similar discharges, to improve the response capability at the major facility or transmission pipeline, or to minimize the possible adverse impacts of any future discharges on public safety and the environment. The owner or operator of the major facility or transmission pipeline shall provide the department with any other information that may be required by the department to evaluate the prevention and response capabilities at the major facility or transmission pipeline. b. The owner or operator of a major facility or transmission pipeline shall immediately notify the department's environmental action line of any malfunction of a leak detection or other discharge monitoring system, or other discharge prevention, safety system, or device. The owner or operator of the major facility or transmission pipeline shall provide information as to the nature of the malfunction and the measures taken to avoid a recurrence. The department may, at any time, require the installation or replacement of a leak detection, discharge monitoring system, or other discharge prevention, safety system, or device because of severe or repeated malfunctions or other failures, or that fails to satisfy the standards prescribed therefor pursuant to section 11 of P.L.1990, c.78 (C.58:10-23.11d11). Nothing in this section shall be construed to limit the authority of the department to direct the owner or operator of a facility or pipeline at any time to take immediate measures to strengthen its prevention or response capabilities. L.1990,c.78,s.10. 58:10-23.11d11. Compliance with construction, performance standards a. On or after the effective date of this act, any new, or substantial modification or replacement of an existing, above-ground storage tank or other above-ground enclosed storage space, or of an existing transmission pipeline, including appurtenant structures, or a leak detection or other monitoring system, and prevention or safety system or devices shall comply with construction or performance standards based upon best available technology, industry standards, or federal requirements, whichever may be more stringent, as may be prescribed by the department or required by law. Except in emergency situations as defined by the department, notice of a proposed new construction or installation, substantial modification or replacement of any structure, system, or device subject to the provisions of this subsection shall be provided to the department at least 60 days prior to the commencement of construction, installation, or modification. The department shall also adopt standards and requirements for retrofitting existing structures, systems, or devices subject to the provisions of this subsection in order to prevent, or to minimize the adverse impacts of, unauthorized discharges. b. (1) The owner or operator of a major facility shall conduct, or cause to be conducted, a structural integrity test of above-ground storage tanks or other above-ground enclosed storage spaces storing hazardous substances, including connecting underground or above-ground pipelines. (2) The owner or operator of a transmission pipeline shall conduct, or cause to be conducted, a structural integrity test of all parts of the pipeline, including all line pipe, valves, and other appurtenances connected to line pipe, or other facilities that store or transport hazardous substances associated with the pipeline. The department shall prescribe the size of the tanks to be tested, where applicable, and the nature and frequency of the testing. c. An above-ground storage tank or other enclosed storage space, and any transmission pipeline existing prior to and on the effective date of P.L.1990, c.78 (C.58:10-23.11d1 et al.), shall be tested in accordance with this subsection within two years of the adoption by the department of standards and regulations therefor. The sequence of testing of existing tanks, enclosed storage spaces, or transmission pipelines shall be determined by the age or suspected age of the structure, the proximity to potable water supplies, the discharge record of the structure for the preceding five years, and the date of the last structural integrity test performed on the structure. The test results and a summary of any remedial actions taken as a consequence thereof shall be submitted to the department within 30 days of completion. d. Testing or inspection of leak detection or other monitoring systems, and preventive or safety systems or devices shall be conducted as frequently as may be required by the department. e. In developing standards or testing procedures or other requirements pursuant to this section, the department shall consider applicable standards and procedures adopted or recommended by the United States Environmental Protection Agency, and the following organizations: (1) American Petroleum Institute (API), 1220 L Street, N.W., Washington, D.C. 20005; (2) American Society for Testing and Materials (ASTM), 1916 Race Street, Philadelphia, Pennsylvania 19103; (3) National Association of Corrosion Engineers (NACE), P.O. Box 218340, Houston, Texas 77218; (4) National Fire Protection Association (NFPA), Batterymarch Park, Quincy, Massachusetts 02269; and (5) Underwriters Laboratories (UL), 333 Pfingston Road, Northbrook, Illinois 60062. Standards or other requirements for transmission pipelines shall be at least as stringent as those established for pipeline facilities by the Secretary of the United States Department of Transportation pursuant to the "Hazardous Liquid Pipeline Safety Act of 1979," 49 U.S.C. s.2001 et seq.; except that transmission pipeline standards and requirements adopted pursuant to this section shall be consistent with applicable standards and requirements adopted pursuant to any other State law regulating transmission pipelines. f. The Department of Community Affairs shall, within 60 days of the adoption of regulations by the department, adopt in the State Uniform Construction Code, all applicable rules and regulations adopted by the department pursuant to this section. L.1990,c.78,s.11. 58:10-23.11d12. Inspection of facility required The owner or operator of a major facility or transmission pipeline shall visually inspect, or cause to be visually inspected, at least once each month, all above-ground pipelines, above-ground storage tanks, and above-ground enclosed storage spaces for leaks, structural and foundation weaknesses, or other maintenance needs. L.1990,c.78,s.12. 58:10-23.11d13. Maintenance of records The owner or operator of a major facility or transmission pipeline shall maintain at the major facility, or in the case of a transmission pipeline, with a registered agent of the owner or operator, for at least 10 years, records of any testing, inspection, maintenance, and repair of all structures, equipment, and detection or monitoring, prevention or safety devices related to discharge prevention and response, and shall make these records available for inspection by the department or appropriate local agencies upon request. Records of employee training and simulated drills for discharge prevention and emergency response shall also be retained and be available for inspection by the department or appropriate local agencies. L.1990,c.78,s.13. 58:10-23.11d14. Rules, regulations Within one year of the effective date of P.L.1990, c.78 (C.58:10-23.11d1 et al.), the department shall adopt, pursuant to the "Administrative Procedure Act," P.L.1968, c.410 (C.52:14B-1 et seq.), rules and regulations necessary to implement the provisions of P.L.1990, c.78 (C.58:10-23.11d1 et al.). Pending adoption of rules and regulations, the department may require a major facility or transmission pipeline to take such action to upgrade the discharge and prevention capabilities at the facility or pipeline as the department may deem appropriate. L.1990,c.78,s.14. 58:10-23.11d15. Compliance not deemed defense Compliance with any standard or plan required to be submitted or adopted pursuant to P.L.1990, c.78 (C.58:10-23.11d1 et al.) shall not be deemed a defense in addition to the defenses enumerated in subsection d. of section 8 of P.L.1976, c.141 (C. 58:10-23.11g). L.1990,c.78,s.15. 58:10-23.11d16. Submission of status report Eighteen months after the adoption of regulations pursuant to section 14 of P.L.1990, c.78 (C.58:10-23.11d14) the department shall prepare and submit to the Senate Environmental Quality Committee, the Assembly Energy and Environment Committee, or their successors, and to the library of the New Jersey Office of Legislative Services, a status report on the submittals of the DPCC and contingency plans required to be adopted pursuant to P.L.1990, c.78 (C.58:10-23.11d1 et al.). The status report shall contain, but need not be limited to, a copy of the schedule of DPCC and contingency plan submittals, the number of major facilities, the number of submittals received, and the submittal schedule for plans not yet received. L.1990,c.78,s.16. 58:10-23.11d17 Maps filed with DEP before June 5, 1998 under P.L. 1990, c.78 4. Notwithstanding the provisions of section 6 of P.L.1990, c.78 (C.58:10-23.11d6) or any other law, rule or regulation to the contrary, the Department of Environmental Protection shall not require a map required to be filed pursuant to P.L.1990, c.78 (C.58:10-23.11d1 et al.) and filed with the department on or before the effective date of this section to be resubmitted in digital form prior to January 1, 2000. L.1998,c.23,s.4.

External source: View on Justia →

This is the verbatim text of N.J.S.A. 58:10-23.11c, retrieved from the New Jersey Legislature's public statute corpus. Statutes are amended periodically — for the most current version, check the external source link above. Kyzer is not a law firm and this page is not legal advice.