N.J.S.A. 40:55D-66.7a

Child care programs, exemption from local zoning restrictions

40:55D-66.7a. Child care programs, exemption from local zoning restrictions 2. Any child care program approved by a local board of education and operated by the board or by an approved sponsor in a public school, before or after regular school hours, pursuant to N.J.S.18A:20-34, shall be deemed a permitted use in all residential and nonresidential districts of a municipality and shall be exempt from local zoning restrictions. L.1999,c.83, s.2. 40:55D-66.8. Siting of structure, equipment for groundwater remedial action 3. a. The siting of a structure or equipment required for a groundwater remedial action approved by the Department of Environmental Protection pursuant to P.L.1977, c.74 (C.58:10A-1 et seq.), shall be deemed to be essential to the continuation of an existing structure or use of a property, including a nonconforming use, or to the development of a property, as authorized in the zoning ordinance of a municipality. A groundwater remedial action subject to this section, including any structure or equipment required in connection therewith, shall, therefore, be deemed to be an accessory use or structure to any structure or use authorized by the development regulations of a municipality; shall be a permitted use in all zoning or use districts of a municipality; and shall not require a use variance pursuant to subsection d. of section 57 of P.L.1975, c.291 (C.40:55D-70). b. A municipality may, by ordinance, adopt reasonable standards for the siting of a structure or equipment required for a groundwater remedial action subject to subsection a. of this section. The standards may include specification of the duration of time allowed for the removal from a site of all structures or equipment used in the remedial action upon expiration of the term of the discharge permit or completion of the remedial action, whichever shall be sooner. Nothing in this subsection shall be deemed to authorize a municipality to require site plan review by a municipal agency for a groundwater remedial action, but an ordinance establishing siting standards may provide penalties and may authorize the municipality to seek injunctive relief for violations of the ordinance. As used in this section, "groundwater remedial action" means the removal or abatement of pollutants in groundwater, and includes de-watering activities performed in connection with the removal or replacement of underground storage tanks, as defined in section 2 of P.L.1986, c.102 (C.58:10A-22), except that as used herein underground storage tanks shall include: (1) farm underground storage tanks of 1,100 gallons or less capacity used for storing motor fuel for noncommercial purposes; (2) underground storage tanks used to store heating oil for on-site consumption in a nonresidential building with a capacity of 2,000 gallons or less; and (3) underground storage tanks used to store heating oil for on-site consumption in a residential building. L.1993,c.351,s.3. 40:55D-66.9. Variance for remedial action 4. If, for any of the reasons set forth in subsection c. of section 57 of P.L.1975, c.291 (C.40:55D-70), a variance is required under that subsection c. for the siting of a structure or equipment to be used in a groundwater remedial action subject to section 3 of P.L.1993, c.351 (C.40:55D-66.8), a variance for the remedial action shall be deemed necessary to avoid exceptional and undue hardship on an owner, lessee or developer of a property for which a variance application is made; however, a zoning ordinance may authorize the zoning board of adjustment or planning board, as appropriate, to establish reasonable terms and conditions for issuance of a subsection c. variance. The zoning board of adjustment or planning board, as appropriate, shall review and take final action on an application for a subsection c. variance for a groundwater corrective action at the next meeting of the zoning board of adjustment or planning board, as appropriate, occurring not less than 20 days following the filing of an application therefor, unless the zoning board of adjustment or planning board, as appropriate, determines that the application lacks information indicated on a checklist adopted by ordinance and made available to the applicant, and the applicant has been notified, in writing, of the specific deficiencies prior to expiration of the 20-day period. L.1993,c.351,s.4.

External source: View on Justia →

This is the verbatim text of N.J.S.A. 40:55D-66.7a, retrieved from the New Jersey Legislature's public statute corpus. Statutes are amended periodically — for the most current version, check the external source link above. Kyzer is not a law firm and this page is not legal advice.